Fase 01 · The project
Project
Freight wagon tracker
Autonomous railway tracking with solar power, 4G connectivity and impact and opening detection.
Our process
How it was done, step by step.
It’s continuing to decrease: the block remains on screen, and the project progresses phase by phase, with the actual work carried out by i-mas in each phase.
Phase 11 / 4The project
Fase 02 · The challenge
The equipment needed to operate autonomously with minimal maintenance in a demanding railway environment, exposed to vibration, weather and long periods without supervision.
Fase 03 · Development
We designed a robust tracker with internal batteries recharged by solar power, engineered for extended autonomy and low energy consumption. It integrates 4G connectivity to send data to the customer's server, an accelerometer for impact detection and Bluetooth communication with peripherals.
Fase 04 · Final product
The system monitors each wagon's position, condition and incidents during transport. It combines solar power, 4G connectivity, onboard sensing and robust design to improve freight traceability and security.